Pre-Requisite: Activate Devices

Make sure the device is activated. See guide "How to Activate New Devices" for guidance.

Goal: Successful Installation

This guide will lead you through the set up process of the drip and drain station. Please see the image below for a sneak peak of the final result.

Step 1: Place Plant on Runoff Tray

  1. Assemble 9" legs into the runoff tray
  2. Place tray on bench along with a plant to collect runoff from

Step 2: Assemble Drip & Drain Station

  1. Assemble legs and siphoning tube into the Drip & Drain stations
  1. Locate the same number of emitter tubes use for a single plant
  2. Remove the emitters from the tubes
  1. Cut the end of the tubes to make insertion on to the drip station lid easier
  1. Insert the tubes into the drip station lid and let them protrude about 0.5"
  2. Put the lid on the drip station (the taller one)

Step 3: Place Drip & Drain Station on Bench

  1. Place the drain cup on the bench under the exit hole of the runoff tray
  2. Place the drip cup on the bench

Step 4: Assign Devices

Assign the Drip & Drain station in AROYA to start recording data. See guide "How to Assign & Install Sensors" for guidance.